Namma Metro Yellow Line: Station List | Opening Date | Route | News


Namma Metro Yellow Line

Bengaluru’s much-awaited Namma Metro Yellow Line is set to be a game-changer for the city’s commuters. Connecting key residential, commercial, and transit hubs, this line promises to ease traffic, cut travel time, and offer a smoother, more reliable way of getting around. As the city gears up for its launch, there’s growing curiosity about its stations, route, progress, and opening date.

Let’s take a closer look at everything you need to know about the Yellow Line—from where it runs and the facilities it will offer to the latest construction updates and what this new corridor means for Bengaluru’s future.

Also Read:- Bengaluru’s Yellow Line Namma Metro Set to Boost Affordable Real Estate Markets

What Is the Namma Metro Yellow Line and Why Does It Matter?

The Namma Metro Yellow Line is one of the newest additions to the city’s metro network under Phase 2 of the project. Stretching from R.V. Road in the south to Bomasandra in the north (industrial and tech hubs included), it covers several high-density areas and connects them seamlessly to the rest of the metro system.

Its significance goes beyond just transport—it’s expected to boost local economies, improve accessibility to workplaces, reduce pollution, and enhance the quality of life for daily commuters.

What Is the Route of the Namma Metro Yellow Line?

What Is the Route of the Namma Metro Yellow Line?

The namma metro yellow line route runs through a strategic corridor, making it one of the most useful metro lines in Bengaluru. The route includes:

  • V. Road (Southern starting point, linking to the Green Line)
  • Jayanagar
  • P. Nagar
  • Central Silk Board (Major traffic junction and interchange hub)
  • HSR Layout
  • Bommanahalli
  • Electronic City (Phases 1 and 2)
  • Bomasandra (Northern terminal point)

The line will link bustling residential areas with IT hubs, industrial zones, and commercial districts, making it a lifeline for daily commuters.

Also Read:- Bangalore Metro Route Map: Timing | Lines | Stations

Which Stations Are Part of the Yellow Line Namma Metro?

Which Stations Are Part of the Yellow Line Namma Metro?

yellow line namma metro stations

The planned stations on the Yellow Line Namma Metro include:

  1. R.V. Road
  2. Jayanagar
  3. J.P. Nagar
  4. Ragigudda
  5. Central Silk Board
  6. HSR Layout
  7. Bommanahalli
  8. Kudlu Gate
  9. Singasandra
  10. Electronic City Phase 1
  11. Electronic City Phase 2
  12. Huskur Road
  13. Hebbagodi
  14. Bommasandra

Each station will feature modern amenities such as escalators, elevators, security systems, and real-time passenger information displays.

When Is the Namma Metro Yellow Line Opening Date?

namma metro yellow line opening date

The Namma Metro Yellow Line is expected to be operational by May 2025. This timeline has been confirmed by officials, with ongoing work focused on track installation, station finishing, and integration of signalling systems.

Has There Been Any Delay in the Bengaluru Namma Metro Yellow Line?

bengaluru namma metro yellow line delay

While the project has seen steady progress, there have been delays due to land acquisition challenges, pandemic-related disruptions, and the complexity of integrating signalling technology. These delays have pushed the timeline slightly, but current updates suggest the May 2025 target is still realistic.

What Is the Status of the Namma Metro Yellow Line CMRS Inspection?

namma metro yellow line cmrs inspection

The CMRS (Commissioner of Metro Railway Safety) inspection is one of the final stages before a metro line can open to the public. For the Yellow Line, CMRS inspections will involve testing tracks, signalling, safety systems, and emergency protocols. Authorities have indicated that inspections are scheduled close to the launch date to ensure all systems are fully ready.

What Are the Features of the Namma Metro Yellow Line Trains?

What Are the Features of the Namma Metro Yellow Line Trains?

namma metro yellow line trains

The trains designed for the Yellow Line are modern, air-conditioned, and equipped with:

  • Wide doors for easy boarding
  • Comfortable seating and standing space
  • Energy-efficient propulsion
  • Digital passenger information systems
  • Safety features including CCTV surveillance and emergency communication buttons

What Does the Namma Metro Yellow Line Map Show?

What Does the Namma Metro Yellow Line Map Show?

namma metro yellow line map

The Namma Metro Yellow Line map highlights the corridor’s path from R.V. Road to Bommasandra, marking all stations and showing interchanges with other lines. This makes it easier for commuters to plan their routes and connections.

Latest Namma Metro Yellow Line Update

namma metro yellow line update

  • Track laying is nearly complete
  • Signalling equipment installation is underway
  • Station interiors are being finished with ticket counters, escalators, and lifts
  • Trial runs are expected to start several months before the official opening
  • Feeder bus routes are being planned for better last-mile connectivity

How Will the Yellow Line Namma Metro Benefit the City?

Once operational, the Yellow Line Namma Metro will:

  • Significantly reduce travel time between the southern and northern parts of the city
  • Provide seamless connectivity to major IT hubs like Electronic City
  • Reduce traffic congestion on key arterial roads
  • Improve air quality by reducing dependency on private vehicles
  • Boost property values along the corridor

Conclusion

The Namma Metro Yellow Line Bengaluru is more than just another metro line—it’s a critical infrastructure project that will transform daily travel for thousands of residents. Connecting busy residential neighborhoods to major IT and commercial hubs, it promises shorter commutes, better accessibility, and a greener future for the city.

At Housiey, we believe infrastructure projects like the Yellow Line not only improve mobility but also shape the future of urban living. If you enjoyed learning about this corridor, be sure to read our detailed Green Line Metro Guide for a complete understanding of Bengaluru’s growing metro network.

FAQs

  • The line is currently targeted for launch in May 2025, pending completion of CMRS inspection and operational validation.
  • Key planned stations include R.V. Road, Koramangala, Domlur, Indiranagar, Ulsoor, M. G. Road, Cubbon Park, Vidhana Soudha, Malleswaram, Yeshwanthpur, and Banaswadi.
  • The namma metro yellow line cmrs inspection is either scheduled soon or in progress; its successful completion is mandatory before opening.
  • Commuters can expect headways of approximately 5–10 minutes during peak hours for efficient service.
  • Yes, interchanges are planned with both the Green Line and Purple Line for seamless urban mobility.
  • Some delays have been noted due to construction, signaling, and inspection scheduling, which may affect the projected timeline.
  • The namma metro yellow line trains are modern, air-conditioned, energy-efficient, and passenger-friendly with digital displays and safety systems.
  • Yes, the namma metro yellow line map shows station locations, connection points, and the corridor alignment across Bengaluru.
  • The namma metro yellow line route runs from R.V. Road in the south through central hubs to Banaswadi in the north, with several important interchanges.
  • Delays stem from construction challenges, integration of complex systems, supply-chain issues, and regulatory finalization.
  • It will relieve traffic congestion, improve connectivity, foster development, and support sustainable, mass transit growth.
  • Significant progress includes completed tunnels and viaducts, track laying, station outfitting, and ongoing system trials.
  • Yes, integration with buses, auto-rikshaws, shuttle services, and bicycle options is part of the commuter experience plan.
  • The Bengaluru Metro Rail Corporation Ltd (BMRCL) will operate the Yellow Line under standard safety and service protocols.
  • Launch fare structures are being finalized; pricing will likely follow metro norms with distance-based or zone-based models.
  • Yes, stations and trains will include elevators, ramps, tactile guidance, and audio announcements for inclusive access.
  • Absolutely—digital signage at stations and mobile apps will provide live train schedules and service alerts.
  • Housiey helped disseminate key updates and raise public awareness about the namma metro yellow line update, encouraging civic engagement.
  • Definitely—our “Green Line Metro Guide” offers a deep look at another vital corridor and complements your understanding of the metro network.
  • Follow official BMRCL communications, urban transport forums, media briefings, and metro awareness platforms for up-to-date news.

Bengaluru’s much-awaited Namma Metro Yellow Line is set to be a game-changer for the city’s commuters. Connecting key residential, commercial, and transit hubs, this line promises to ease traffic, cut travel time, and offer a smoother, more reliable way of getting around. As the city gears up for its launch, there’s growing curiosity about its stations, route, progress, and opening date.

Let’s take a closer look at everything you need to know about the Yellow Line—from where it runs and the facilities it will offer to the latest construction updates and what this new corridor means for Bengaluru’s future.

Also Read:- Bengaluru’s Yellow Line Namma Metro Set to Boost Affordable Real Estate Markets

What Is the Namma Metro Yellow Line and Why Does It Matter?

The Namma Metro Yellow Line is one of the newest additions to the city’s metro network under Phase 2 of the project. Stretching from R.V. Road in the south to Bomasandra in the north (industrial and tech hubs included), it covers several high-density areas and connects them seamlessly to the rest of the metro system.

Its significance goes beyond just transport—it’s expected to boost local economies, improve accessibility to workplaces, reduce pollution, and enhance the quality of life for daily commuters.

What Is the Route of the Namma Metro Yellow Line?

What Is the Route of the Namma Metro Yellow Line?

The namma metro yellow line route runs through a strategic corridor, making it one of the most useful metro lines in Bengaluru. The route includes:

  • V. Road (Southern starting point, linking to the Green Line)
  • Jayanagar
  • P. Nagar
  • Central Silk Board (Major traffic junction and interchange hub)
  • HSR Layout
  • Bommanahalli
  • Electronic City (Phases 1 and 2)
  • Bomasandra (Northern terminal point)

The line will link bustling residential areas with IT hubs, industrial zones, and commercial districts, making it a lifeline for daily commuters.

Also Read:- Bangalore Metro Route Map: Timing | Lines | Stations

Which Stations Are Part of the Yellow Line Namma Metro?

Which Stations Are Part of the Yellow Line Namma Metro?

yellow line namma metro stations

The planned stations on the Yellow Line Namma Metro include:

  1. R.V. Road
  2. Jayanagar
  3. J.P. Nagar
  4. Ragigudda
  5. Central Silk Board
  6. HSR Layout
  7. Bommanahalli
  8. Kudlu Gate
  9. Singasandra
  10. Electronic City Phase 1
  11. Electronic City Phase 2
  12. Huskur Road
  13. Hebbagodi
  14. Bommasandra

Each station will feature modern amenities such as escalators, elevators, security systems, and real-time passenger information displays.

When Is the Namma Metro Yellow Line Opening Date?

namma metro yellow line opening date

The Namma Metro Yellow Line is expected to be operational by May 2025. This timeline has been confirmed by officials, with ongoing work focused on track installation, station finishing, and integration of signalling systems.

Has There Been Any Delay in the Bengaluru Namma Metro Yellow Line?

bengaluru namma metro yellow line delay

While the project has seen steady progress, there have been delays due to land acquisition challenges, pandemic-related disruptions, and the complexity of integrating signalling technology. These delays have pushed the timeline slightly, but current updates suggest the May 2025 target is still realistic.

What Is the Status of the Namma Metro Yellow Line CMRS Inspection?

namma metro yellow line cmrs inspection

The CMRS (Commissioner of Metro Railway Safety) inspection is one of the final stages before a metro line can open to the public. For the Yellow Line, CMRS inspections will involve testing tracks, signalling, safety systems, and emergency protocols. Authorities have indicated that inspections are scheduled close to the launch date to ensure all systems are fully ready.

What Are the Features of the Namma Metro Yellow Line Trains?

What Are the Features of the Namma Metro Yellow Line Trains?

namma metro yellow line trains

The trains designed for the Yellow Line are modern, air-conditioned, and equipped with:

  • Wide doors for easy boarding
  • Comfortable seating and standing space
  • Energy-efficient propulsion
  • Digital passenger information systems
  • Safety features including CCTV surveillance and emergency communication buttons

What Does the Namma Metro Yellow Line Map Show?

What Does the Namma Metro Yellow Line Map Show?

namma metro yellow line map

The Namma Metro Yellow Line map highlights the corridor’s path from R.V. Road to Bommasandra, marking all stations and showing interchanges with other lines. This makes it easier for commuters to plan their routes and connections.

Latest Namma Metro Yellow Line Update

namma metro yellow line update

  • Track laying is nearly complete
  • Signalling equipment installation is underway
  • Station interiors are being finished with ticket counters, escalators, and lifts
  • Trial runs are expected to start several months before the official opening
  • Feeder bus routes are being planned for better last-mile connectivity

How Will the Yellow Line Namma Metro Benefit the City?

Once operational, the Yellow Line Namma Metro will:

  • Significantly reduce travel time between the southern and northern parts of the city
  • Provide seamless connectivity to major IT hubs like Electronic City
  • Reduce traffic congestion on key arterial roads
  • Improve air quality by reducing dependency on private vehicles
  • Boost property values along the corridor

Conclusion

The Namma Metro Yellow Line Bengaluru is more than just another metro line—it’s a critical infrastructure project that will transform daily travel for thousands of residents. Connecting busy residential neighborhoods to major IT and commercial hubs, it promises shorter commutes, better accessibility, and a greener future for the city.

At Housiey, we believe infrastructure projects like the Yellow Line not only improve mobility but also shape the future of urban living. If you enjoyed learning about this corridor, be sure to read our detailed Green Line Metro Guide for a complete understanding of Bengaluru’s growing metro network.

FAQs