Ganga Expressway: Route Map | Opening Date | Village List & More


Ganga Expressway

The Ganga Expressway is one of the most ambitious expressway projects in India, set to revolutionize connectivity across Uttar Pradesh. It is envisioned as a fully access-controlled six-lane expressway, with the potential for expansion to eight lanes in the future. Stretching across multiple districts, the expressway aims to reduce travel time, boost economic growth, and provide seamless connectivity between Western and Eastern UP.

In this blog, we will cover the Ganga Expressway route map, its completion date, village list, project contractors, phase-wise developments, and current status.

What is the Ganga Expressway?

The Ganga Expressway is a 594 km long expressway project undertaken by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). The expressway will connect Meerut in Western UP to Prayagraj (Allahabad) in Eastern UP, covering 12 districts in its route.

Once completed, it will be the second-longest expressway in India, after the Delhi-Mumbai Expressway. The project also includes a 3.5 km long airstrip for emergency landing facilities for the Indian Air Force (IAF).

Ganga Expressway Route Map

The expressway passes through 12 districts in Uttar Pradesh, starting from Meerut and ending in Prayagraj. Here is a detailed breakdown:

Start Point End Point Total Length Number of Lanes
Meerut Prayagraj 594 km 6 lanes (expandable to 8)

Ganga Expressway Route

The major districts covered along the route include:

  1. Meerut
  2. Hapur
  3. Bulandshahr
  4. Amroha
  5. Sambhal
  6. Budaun
  7. Shahjahanpur
  8. Hardoi
  9. Unnao
  10. Raebareli
  11. Pratapgarh
  12. Prayagraj

Ganga Expressway Completion Date

The foundation stone for the Ganga Expressway was laid by Prime Minister Narendra Modi on December 18, 2021. The expressway is being developed in multiple phases:

  • Phase 1: Expected completion by December 2024
  • Phase 2: Expected completion by 2026-27

The project is currently in various stages of land acquisition and construction.

Ganga Expressway Village List

The expressway passes through 519 villages across the 12 districts of Uttar Pradesh. Below is a district-wise list of key villages along the route:

District Major Villages Covered
Meerut Mawana, Parikshitgarh
Hapur Babugarh, Pilkhuwa
Bulandshahr Jahangirabad, Dibai
Amroha Gajraula, Hasanpur
Sambhal Chandausi, Bahjoi
Budaun Dataganj, Sahaswan
Shahjahanpur Powayan, Tilhar
Hardoi Shahabad, Bilgram
Unnao Safipur, Bangarmau
Raebareli Lalganj, Bachhrawan
Pratapgarh Kunda, Raniganj
Prayagraj Handia, Phulpur

Ganga Expressway Project Contractors List

The expressway is being developed in four construction packages, with contracts awarded to major infrastructure companies:

Package Contractor Section Covered
1 IRB Infrastructure Meerut to Amroha
2 Adani Enterprises Amroha to Shahjahanpur
3 Adani Enterprises Shahjahanpur to Unnao
4 IRB Infrastructure Unnao to Prayagraj

These contractors are responsible for designing, constructing, and maintaining the expressway under a BOT (Build-Operate-Transfer) model.

Ganga Expressway Current Status

As of March 2025, the construction progress is as follows:

  • Land acquisition: Over 92% completed
  • Earthwork and foundation: Ongoing in all sections
  • Bridge and interchange construction: Partially completed
  • Completion target: Phase 1 by December 2024

Ganga Expressway Phase 2 Route Map & Village List

Phase 2 Expansion

The Phase 2 of Ganga Expressway will extend further to Haridwar in the north and Ballia in the east, increasing the total length beyond 1000 km.

The major additions in Phase 2 include:

  • Haridwar Extension (connecting to Uttarakhand)
  • Ballia Extension (linking to Bihar)

Ganga Expressway Phase 2 Village List

The additional districts covered in Phase 2 include:

  1. Haridwar (Uttarakhand)
  2. Chandauli
  3. Ghazipur
  4. Ballia

Conclusion

The Ganga Expressway is a landmark infrastructure project that will enhance connectivity, boost trade, and improve regional development in Uttar Pradesh. With high-speed access, reduced congestion, and future expansion potential, it is set to become one of India’s most vital expressways.

At Housiey, we strive to provide detailed real estate insights for buyers and investors. If you’re planning to invest in property near expressways, this is the perfect time to explore opportunities along the Ganga Expressway corridor.

 Don’t forget to check out our blog on the “Mhada Konkan Lottery 2025” for affordable housing options!

FAQs

  • The expressway spans 594 km in Phase 1 and will exceed 1000 km after Phase 2.
  • It connects Meerut to Prayagraj, passing through 12 districts in UP.
  • Phase 1 is expected to be completed by December 2024.
  • Over 92% land acquisition is complete, and construction is ongoing.
  • Yes, toll charges will apply based on vehicle type and distance traveled.
  • It will be a six-lane expressway, expandable to eight lanes in the future.
  • The total cost of the project is estimated at ₹36,230 crore.
  • The project is undertaken by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) and is being built by IRB Infrastructure and Adani Enterprises.
  • Yes, a 3.5 km long emergency airstrip will be constructed in Shahjahanpur for the Indian Air Force.
  • It will boost economic growth, improve transportation, enhance connectivity, and create job opportunities in the region.
  • The expected speed limit is 120 km/h for light vehicles.
  • Yes, there will be fuel stations, food courts, rest areas, and emergency services along the expressway.
  • Over 92% of the land has already been acquired, and construction is in full swing.
  • It will reduce travel time between Western and Eastern UP, linking Meerut to Prayagraj and eventually Haridwar and Ballia in Phase 2.
  • Yes, environmental clearances have been obtained, and efforts are being made to minimize ecological impact by incorporating green corridors and tree plantations.
  • Yes, it will intersect with Delhi-Meerut Expressway, Agra-Lucknow Expressway, and Purvanchal Expressway, improving overall connectivity.
  • Land acquisition, funding, and environmental clearances were some initial challenges, but most have been resolved.
  • The travel time will be reduced from 12-14 hours to approximately 6-7 hours.
  • Phase 2 will extend the expressway to Haridwar and Ballia, enhancing regional connectivity further.
  • The exact toll rates are yet to be finalized but will be based on distance traveled and vehicle type, similar to other expressways in India.

The Ganga Expressway is one of the most ambitious expressway projects in India, set to revolutionize connectivity across Uttar Pradesh. It is envisioned as a fully access-controlled six-lane expressway, with the potential for expansion to eight lanes in the future. Stretching across multiple districts, the expressway aims to reduce travel time, boost economic growth, and provide seamless connectivity between Western and Eastern UP.

In this blog, we will cover the Ganga Expressway route map, its completion date, village list, project contractors, phase-wise developments, and current status.

What is the Ganga Expressway?

The Ganga Expressway is a 594 km long expressway project undertaken by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). The expressway will connect Meerut in Western UP to Prayagraj (Allahabad) in Eastern UP, covering 12 districts in its route.

Once completed, it will be the second-longest expressway in India, after the Delhi-Mumbai Expressway. The project also includes a 3.5 km long airstrip for emergency landing facilities for the Indian Air Force (IAF).

Ganga Expressway Route Map

The expressway passes through 12 districts in Uttar Pradesh, starting from Meerut and ending in Prayagraj. Here is a detailed breakdown:

Start Point End Point Total Length Number of Lanes
Meerut Prayagraj 594 km 6 lanes (expandable to 8)

Ganga Expressway Route

The major districts covered along the route include:

  1. Meerut
  2. Hapur
  3. Bulandshahr
  4. Amroha
  5. Sambhal
  6. Budaun
  7. Shahjahanpur
  8. Hardoi
  9. Unnao
  10. Raebareli
  11. Pratapgarh
  12. Prayagraj

Ganga Expressway Completion Date

The foundation stone for the Ganga Expressway was laid by Prime Minister Narendra Modi on December 18, 2021. The expressway is being developed in multiple phases:

  • Phase 1: Expected completion by December 2024
  • Phase 2: Expected completion by 2026-27

The project is currently in various stages of land acquisition and construction.

Ganga Expressway Village List

The expressway passes through 519 villages across the 12 districts of Uttar Pradesh. Below is a district-wise list of key villages along the route:

District Major Villages Covered
Meerut Mawana, Parikshitgarh
Hapur Babugarh, Pilkhuwa
Bulandshahr Jahangirabad, Dibai
Amroha Gajraula, Hasanpur
Sambhal Chandausi, Bahjoi
Budaun Dataganj, Sahaswan
Shahjahanpur Powayan, Tilhar
Hardoi Shahabad, Bilgram
Unnao Safipur, Bangarmau
Raebareli Lalganj, Bachhrawan
Pratapgarh Kunda, Raniganj
Prayagraj Handia, Phulpur

Ganga Expressway Project Contractors List

The expressway is being developed in four construction packages, with contracts awarded to major infrastructure companies:

Package Contractor Section Covered
1 IRB Infrastructure Meerut to Amroha
2 Adani Enterprises Amroha to Shahjahanpur
3 Adani Enterprises Shahjahanpur to Unnao
4 IRB Infrastructure Unnao to Prayagraj

These contractors are responsible for designing, constructing, and maintaining the expressway under a BOT (Build-Operate-Transfer) model.

Ganga Expressway Current Status

As of March 2025, the construction progress is as follows:

  • Land acquisition: Over 92% completed
  • Earthwork and foundation: Ongoing in all sections
  • Bridge and interchange construction: Partially completed
  • Completion target: Phase 1 by December 2024

Ganga Expressway Phase 2 Route Map & Village List

Phase 2 Expansion

The Phase 2 of Ganga Expressway will extend further to Haridwar in the north and Ballia in the east, increasing the total length beyond 1000 km.

The major additions in Phase 2 include:

  • Haridwar Extension (connecting to Uttarakhand)
  • Ballia Extension (linking to Bihar)

Ganga Expressway Phase 2 Village List

The additional districts covered in Phase 2 include:

  1. Haridwar (Uttarakhand)
  2. Chandauli
  3. Ghazipur
  4. Ballia

Conclusion

The Ganga Expressway is a landmark infrastructure project that will enhance connectivity, boost trade, and improve regional development in Uttar Pradesh. With high-speed access, reduced congestion, and future expansion potential, it is set to become one of India’s most vital expressways.

At Housiey, we strive to provide detailed real estate insights for buyers and investors. If you’re planning to invest in property near expressways, this is the perfect time to explore opportunities along the Ganga Expressway corridor.

 Don’t forget to check out our blog on the “Mhada Konkan Lottery 2025” for affordable housing options!

FAQs